CAPABILITIES

What we take off your plate

Design support, sourcing, sampling, production, quality control and export documentation — coordinated from Xiamen by one team, on a schedule you can plan a launch around.

2025

Established in Xiamen

288

Styles ready to sample

100

MOQ per style (pcs)

3–5

Days to first sample

PRODUCTION

A partner plant built for volume and for small runs

We produce with a long-standing partner plant in Zhejiang — over 100,000 m² of floor space, 600+ staff and 20–40 million pieces a year. That scale is what makes a 100-piece run possible alongside a 50,000-piece order.

Floor space100,000 m² · automated cutting, hanging transport, laser matching
Team600+ staff, in-house pattern room and sample centre
Annual output20–40 million pieces
Sampling3–5 days on an existing block · 7–10 days for a new pattern
Repeat orders7–10 days on stocked fabric
Bulk lead time25–35 days after sample approval
QUALITY & COMPLIANCE

Documentation you can put in front of a buyer

OEKO-TEX® Standard 100Fabric certified free of harmful substances — EU / US retail standard
ISO 9001Quality management system
ISO 14001Environmental management system
InspectionAQL 2.5 pre-shipment, third-party inspection welcome
TestingSquat-proof opacity, colour fastness, pilling ≥ 4, four-way stretch recovery

Copies of certificates and test reports are shared with buyers under NDA.

HOW WE WORK

Six checkpoints between your brief and your container

01   Brief and feasibility

Two days. We review styles, quantities, target price and market requirements, then confirm what is realistic before you commit.

02   Fabric and trim selection

Butter-soft 75/25 or 80/20 nylon-spandex at 220–260 gsm, plus 78/22 polyester options — matched to the hand-feel and opacity your product needs.

03   Tech pack and pattern

We grade the pattern to your size chart, set construction details and confirm measurements before anything is cut.

04   Sampling

3–5 days on an existing block. You approve fit, colour and finish on a physical sample — not a render.

05   Production and in-line QC

25–35 days. First-piece approval, then inspection every 50 pieces, with photos shared at each checkpoint.

06   Final inspection and shipping

AQL 2.5 pre-shipment inspection, packing list and test reports, then FOB Xiamen or DDP to your warehouse.